Close Menu
Liberal News
  • Homepage
  • News
  • Podcast
  • Politics
  • Entertainment
  • Business
  • Crime
  • Health
  • Sports
  • Lifestyle
  • Culture
What's Hot

Military Vows to Track Down Otukpo-Nobi Attackers

27 Kidnap Victims Rescued as Troops Frustrate Terrorists’ Abduction Plans in Sokoto, Zamfara

From Investment to Exports: FG Unveils New Economic Milestones

Facebook X (Twitter) Instagram
  • Homepage
  • News
  • Podcast
  • Politics
  • Entertainment
  • Business
  • Crime
  • Health
  • Sports
  • Lifestyle
  • Culture
Facebook X (Twitter) Instagram Pinterest Vimeo
Liberal NewsLiberal News
  • Homepage
  • News
  • Podcast
  • Politics
  • Entertainment
  • Business
  • Crime
  • Health
  • Sports
  • Lifestyle
  • Culture
Liberal News
You are at:Home » FG to Begin Carter Bridge Construction, Speed Up Eko Bridge Repairs in Lagos
Works

FG to Begin Carter Bridge Construction, Speed Up Eko Bridge Repairs in Lagos

Onu JoyBy Onu JoyJune 19, 2026No Comments4 Mins Read14 Views
Facebook WhatsApp Twitter Pinterest Telegram LinkedIn Tumblr Email Reddit Copy Link
Share
WhatsApp Facebook Twitter LinkedIn Pinterest Email Telegram Copy Link

The Federal Government will commence construction of a new Carter Bridge in Lagos this month while accelerating rehabilitation works on the Eko Bridge as part of efforts to strengthen critical transport infrastructure across the country.

Minister of Works, Senator David Umahi, disclosed this on Thursday during an inspection of ongoing federal road and bridge projects in Lagos, expressing confidence that rehabilitation of the Eko Bridge would be completed before the end of the year.

According to the minister, the Ministry has adopted the use of T-beams instead of conventional concrete beams to speed up reconstruction without compromising engineering standards or public safety.

He said excavation work is also ongoing beneath the bridge to achieve the standard 5.6-metre headroom required for heavy-duty trucks, adding that all future federal bridge projects would be designed with a higher clearance of 6.5 metres.

Umahi attributed the deterioration of the bridge to repeated collisions involving heavy-duty trucks, fire incidents caused by illegal trading activities beneath the bridge, and unauthorised sand dredging around its foundations.

To curb further abuse of public infrastructure, he directed the Federal Controller of Works in Lagos to establish a task force to stop illegal parking of trucks and all forms of unauthorised activities beneath bridge structures.

The minister disclosed that the Federal Government is seeking about ₦12 billion for emergency intervention works to stabilise critical sections of the bridge, while an ongoing contract valued at approximately ₦18 billion covers underwater repairs and the replacement of damaged structural components.

On the proposed Carter Bridge, Umahi said preparations had reached an advanced stage, commending China Civil Engineering Construction Corporation (CCECC) for mobilising equipment and personnel to site ahead of receiving the statutory mobilisation payment.

He said the contractor’s commitment had demonstrated its readiness to partner with the Federal Government, adding that the Ministry would proceed with processing the required 30 per cent mobilisation fee.

Umahi also praised Advanced Engineering Consultant (AEC) for reviewing the bridge alignment and resolving major engineering and stakeholder concerns, including issues affecting the Oba of Lagos’ Palace and other sensitive locations.

According to him, the new Carter Bridge will incorporate modern engineering features, including two 105-metre navigation spans to improve water transportation and a cable-supported bridge structure built to international standards.

He disclosed that site activities would begin on Monday, while full mobilisation for the project is expected before the end of the month.

The minister also highlighted other major infrastructure projects being implemented under President Bola Ahmed Tinubu’s administration, revealing that funds had been released for Section One of the 125-kilometre Agwanga–Jos Legacy Road Project.

He added that the Gombe–Biu Road contract had been awarded, while the design of the Gombe–Bauchi Road is currently underway.

Responding to criticism of President Tinubu’s administration, Umahi dismissed claims by some political opponents that they were better qualified to lead the country, insisting that the President’s record in infrastructure development speaks for itself.

“Talk is very cheap,” the minister said, maintaining that effective leadership is measured by the courage to confront challenges and deliver practical solutions.

Earlier, the Director of Advanced Engineering Consultant, Mr. Olatinwo Tomilola Alatinwo, said the redesigned bridge alignment would minimise disruption to surrounding communities while expanding the central navigation spans from 75 metres to about 105 metres on each side.

He added that the new Carter Bridge would have a height of 12 metres to accommodate both current and future transportation demands along the corridor.

Also speaking, the Project Manager of China Civil Engineering Construction Corporation Nigeria Limited, Mr. Dang Yinan, assured the Federal Government that the company was fully prepared to commence work on schedule, with site access expected to begin next week.

Advanced Engineering Consultant (AEC) China Civil Engineering Construction Corporation (CCECC) David Umahi - Minister of Works Federal Ministry Of Works Mr. Dang Yinan Mr. Olatinwo Tomilola Alatinwo
Share. WhatsApp Facebook Twitter Pinterest LinkedIn Reddit Telegram Email Copy Link
Previous ArticleFG Unveils Expanded Sickle Cell Care Initiative to Improve Survival Rates
Next Article Tinubu Approves Six-Month Tenure Extension for Customs Boss Adeniyi
Onu Joy
  • Website

Related Posts

Tinubu Reaffirms Commitment to Safe, Quality Infrastructure

July 15, 2026

Umahi Camp Faults Obi for Declining Performance Debate

July 13, 2026

Works Ministry Extols Ogbuagu’s Service, Leadership at Retirement

July 11, 2026
Top Posts

FG Orders Mass Termination of Non-Performing Road Contracts on Abuja–Lokoja, Okene–Ajaokuta, and Lokoja–Shintaku–Dekina–Anyigba Corridors

November 26, 2025298 Views

Barrister Comfort Odoma Leads Multi-Sector NGOs in Abuja Outreach, Feeds Hundreds of Less Privileged

November 9, 2025298 Views

Princess Joy Idam Responds to Hon. Chinedu Ogah on Amasiri Situation

February 18, 2026239 Views

FG Unveils Plan to Turn Cashew into Major Export Earner, Create Jobs

July 16, 2026216 Views
Don't Miss
Security July 21, 2026

Military Vows to Track Down Otukpo-Nobi Attackers

By Vicky Attah, Correspondent The military has reaffirmed its commitment to restoring peace in Benue…

27 Kidnap Victims Rescued as Troops Frustrate Terrorists’ Abduction Plans in Sokoto, Zamfara

From Investment to Exports: FG Unveils New Economic Milestones

FG Urges Nigerians to Support Breastfeeding

About Us
About Us

Liberal News bring to you the latest news updates

Our Picks

Military Vows to Track Down Otukpo-Nobi Attackers

27 Kidnap Victims Rescued as Troops Frustrate Terrorists’ Abduction Plans in Sokoto, Zamfara

From Investment to Exports: FG Unveils New Economic Milestones

Most Popular

FG Urges Nigerians to Support Breastfeeding

July 21, 20262 Views

From Investment to Exports: FG Unveils New Economic Milestones

July 21, 20262 Views

Police Nab Suspect, Recover Locally Made Pistol, Live Cartridge in Ibadan Crackdown

July 13, 20263 Views
© 2026 Liberal News. Designed by Domo Tech Media.

Type above and press Enter to search. Press Esc to cancel.