Close Menu
Liberal News
  • Homepage
  • News
  • Podcast
  • Politics
  • Entertainment
  • Business
  • Crime
  • Health
  • Sports
  • Lifestyle
  • Culture
What's Hot

“Science Must Save Lives”: FG, Global Partners Move to Fast-Track CAR-T Therapy, Medicine Security Agenda

Tinubu’s Re-Election Bid Gains Momentum as Umahi Endorses Second-Term Form

Zero Tolerance for Contraband: Nigerian Correctional Service Boss Warns Officers, Orders Destruction of 1,167 Seized Phones

Facebook X (Twitter) Instagram
  • Homepage
  • News
  • Podcast
  • Politics
  • Entertainment
  • Business
  • Crime
  • Health
  • Sports
  • Lifestyle
  • Culture
Facebook X (Twitter) Instagram Pinterest Vimeo
Liberal NewsLiberal News
  • Homepage
  • News
  • Podcast
  • Politics
  • Entertainment
  • Business
  • Crime
  • Health
  • Sports
  • Lifestyle
  • Culture
Liberal News
You are at:Home » FG Restates Commitment to Quality, Timely Road Projects in Katsina
Works

FG Restates Commitment to Quality, Timely Road Projects in Katsina

Joy OnuBy Joy OnuJanuary 25, 2026No Comments3 Mins Read30 Views
Facebook WhatsApp Twitter Pinterest Telegram LinkedIn Tumblr Email Reddit Copy Link
Share
WhatsApp Facebook Twitter LinkedIn Pinterest Email Telegram Copy Link

By Joy Onu

The Federal Government has reiterated its commitment to the timely delivery of quality federal road projects in Katsina State, assuring residents that ongoing works are being executed in line with approved standards.

The assurance was given on Friday during a national media tour of ongoing and completed federal road projects across the state, organised under the Renewed Hope Agenda of President Bola Ahmed Tinubu.

 


Speaking to journalists at various project sites, the Federal Controller of Works in Katsina State, Engr. Idris Matinja, said key projects — including the Ungwan Iliya Bagudu–Kwantakaran–Tsiga–Bakori Road with the Kadabo bridges in Kafur Local Government Area, and the dualisation of the Kano–Katsina Road from the Katsina–Kano State border to the Katsina Steel Rolling Mill Roundabout — were progressing steadily in line with the specifications of the Federal Ministry of Works.

Matinja disclosed that the 17-kilometre Ungwan Iliya–Bakori Road project, awarded in February 2025, comprises three bridges and has so far recorded over 11 per cent completion. He added that work has advanced on stone base layers, while more than four kilometres of lined drainage have been completed.

“Our quality assurance assessments confirm that the work being carried out fully conforms with the ministry’s specifications,” he said.

The Project Manager, Engr. David Omotosho, who represented the contractor, Messrs. Halis Matrix Limited, acknowledged that the project initially faced security challenges along some sections of the corridor. He said the contractor has since fully mobilised to site with adequate equipment and personnel.

According to him, the project has now reached about 15.5 per cent completion, with base course works completed on over four kilometres. He added that the contractor is targeting 40 to 45 per cent completion within the next few months.

Professional bodies that participated in the inspection, including the Council for the Regulation of Engineering in Nigeria (COREN), Katsina Branch, led by Engr. Adamu Dahiru, and the Nigerian Society of Engineers (NSE), represented by Engr. Abbas Sada, confirmed that the quality of work observed meets required engineering standards. They noted that the projects are being executed with adherence to professional ethics and attention to the safety of host communities.

Also speaking during the tour, the Senior Special Assistant to the President on Community Engagement, Hon. Abdullahi Tanko Yakasai, expressed satisfaction with the quality of work and level of mobilisation on the sites visited. He urged contractors to sustain the pace to ensure timely delivery.

Meanwhile, three completed emergency repair projects along Mararraba–Tashan Boka–Gidan Daudu on the Katsina–Mararrabar Kankara Road were commissioned. The projects form part of the 260 emergency interventions initiated by the present administration over a year ago.

Other projects commissioned include emergency repairs of critical washouts at KM 1+775 and KM 2+736 along the Katsina–Dutsinma–Kankara Road, as well as the reinstatement of critical washouts and rehabilitation of damaged portions along the Katsina–Daura Road.

Yakasai said the interventions reflect the administration’s efforts to address infrastructure challenges caused by natural disasters and improve the well-being of communities, noting that many of the projects were initiated and completed mostly within three months.

Community representatives, Yahaya Usman Maikaulasa and Kabiru Tajuddeen, welcomed the interventions, noting that the affected roads were previously prone to frequent accidents and vehicular breakdowns.

“Since the repair of this road by the present administration, we no longer experience such challenges,” they said.

Council for the Regulation of Engineering in Nigeria - COREN Engr. Abbas Sada Engr. Adamu Dahiru Engr. David Omotosho Federal Ministry Of Works Hon. Abdullahi Tanko Yakasai Matrix Limited Minister David Umahi Muhammed A. Ahmed - Director Press and Public Relations - FMW Nigerian Society of Engineers (NSE)
Share. WhatsApp Facebook Twitter Pinterest LinkedIn Reddit Telegram Email Copy Link
Previous ArticleCYPF Expands Menstrual Hygiene Project, Commissions New Facility in Aleita School
Next Article Shell Plans $20bn Investment in Nigeria as Tinubu Approves Incentives for Bonga Project
Joy Onu
  • Website

Related Posts

FG Flags Off Media Tour of North West Projects, Emphasises Transparency and Delivery

May 2, 2026

FG Rejigs Kogi Road Contracts, Targets Faster Delivery and Durability

April 30, 2026

Umahi Moves to Resolve Ebonyi APC Crisis, Reaffirms Support for Tinubu’s Re-election

April 27, 2026
Top Posts

Barrister Comfort Odoma Leads Multi-Sector NGOs in Abuja Outreach, Feeds Hundreds of Less Privileged

November 9, 2025297 Views

Princess Joy Idam Responds to Hon. Chinedu Ogah on Amasiri Situation

February 18, 2026230 Views

Neglecting The Boy Child Threatens National Stability: Speakers Warns at Yargote Summit

November 29, 2025179 Views

Dr. Iwowarri Berian James at 70: Making the Case for Energy Therapy in Nigeria

February 3, 2026149 Views
Don't Miss
Health May 6, 2026

“Science Must Save Lives”: FG, Global Partners Move to Fast-Track CAR-T Therapy, Medicine Security Agenda

By Victoria Attah, ABUJA The Federal Government has stepped up efforts to strengthen Nigeria’s medicine…

Tinubu’s Re-Election Bid Gains Momentum as Umahi Endorses Second-Term Form

Zero Tolerance for Contraband: Nigerian Correctional Service Boss Warns Officers, Orders Destruction of 1,167 Seized Phones

NOUN Appoints Prof. Samaila Mande as Business School Director, Targets Industry-Driven Growth

About Us
About Us

Liberal News bring to you the latest news updates

Our Picks

“Science Must Save Lives”: FG, Global Partners Move to Fast-Track CAR-T Therapy, Medicine Security Agenda

Tinubu’s Re-Election Bid Gains Momentum as Umahi Endorses Second-Term Form

Zero Tolerance for Contraband: Nigerian Correctional Service Boss Warns Officers, Orders Destruction of 1,167 Seized Phones

Most Popular

“Science Must Save Lives”: FG, Global Partners Move to Fast-Track CAR-T Therapy, Medicine Security Agenda

May 6, 20262 Views

Tinubu’s Re-Election Bid Gains Momentum as Umahi Endorses Second-Term Form

May 6, 20263 Views

INEC Adjusts Campaign Timeline for Osun Governorship Election

April 17, 20264 Views
© 2026 Liberal News. Designed by Domo Tech Media.

Type above and press Enter to search. Press Esc to cancel.